Custom TunnelSAFE Ensures Worker Safety at the Himeji Tunnel Project
The 1km long Himeji flood drainage tunnel project required a unique safety solution to protect 10 workers in case of an underground emergency.
The 1km long Himeji flood drainage tunnel project required a unique safety solution to protect 10 workers in case of an underground emergency.
This chemical shelter with fixed wheel and tow kit allowed on site personnel to move the safe haven onto the port during ammonia imports.
This North American client wished to replace its existing laboratory with a more considerable, customised modular lab. The major driving factor behind a pre-built solution was to avoid a prolonged civil construction project on-site.
Tronox in Kemerton Industrial Park, Western Australia, install custom chemical Safe Haven with remote plant access and chlorine gas monitoring.
Rio Tinto in Yarwun, Queensland, install multiple custom refuge chambers to protect from Ammonia gas risks.
With multiple goods handled, accompanied by numerous companies and vessels sharing a port, it can be challenging to ensure safe practices …
Restoring a non-compliant Brokrew Emergency Refuge Bay gave it new life and more importantly improves safety on-site.
Custom refuge chamber designed for a small 4.4m diameter tunnel boring machine (TBM) with limited gantry space.
Permanent or fixed refuge chambers for large operations provide a dual-purpose solution. Serving as a crib room and protecting each shift…
Four 40-person emergency shelters were installed and commissioned at Yara Pilbara Fertilisers. Anhydrous ammonia