Custom TunnelSAFE Ensures Worker Safety at the Himeji Tunnel Project
The 1km long Himeji flood drainage tunnel project required a unique safety solution to protect 10 workers in case of an underground emergency.
The 1km long Himeji flood drainage tunnel project required a unique safety solution to protect 10 workers in case of an underground emergency.
This chemical shelter with fixed wheel and tow kit allowed on site personnel to move the safe haven onto the port during ammonia imports.
This North American client wished to replace its existing laboratory with a more considerable, customised modular lab. The major driving factor behind a pre-built solution was to avoid a prolonged civil construction project on-site.
Tronox in Kemerton Industrial Park, Western Australia, install custom chemical Safe Haven with remote plant access and chlorine gas monitoring.
Rio Tinto in Yarwun, Queensland, install multiple custom refuge chambers to protect from Ammonia gas risks.
How to transform a Shelter-in-Place into a zero vulnerability Safe Haven, and ensure maximum protection for all personnel on-site.
Webuild Spa incorporates TunnelSAFE Design on rails to improve safety and transportation at the Riachuelo Environmental Restoration System project.
The future of mining is rapidly growing at Lundin Mining; new technology is used to build operations while upholding excellence in health and safety.
Restoring a non-compliant Brokrew Emergency Refuge Bay gave it new life and more importantly improves safety on-site.
A&L Biologicals addresses outdoor plant growth chamber challenges with a custom walk-in chamber.