Skip to content
MineARC Systems
  • Company
    • About Us
    • Impact
    • Share Your Story
    • Footprint
    • Regulations
    • Careers
  • Products
    • Chambers
      • MineSAFE
        • MineSAFE Standard Design Refuge Chamber
        • MineSAFE Compact Design Refuge Chamber
        • MineSAFE Essential Design Refuge Chamber
        • MineSAFE Narrow Design Refuge Chamber
        • MineSAFE Modular Design Refuge Chamber
        • MineSAFE Permanent Refuge Shelter
      • ChemSAFE
        • ChemSAFE Standard Design Safe Haven
        • ChemSAFE Utility Design Safe Haven
        • ChemSAFE Sealed Rooms
      • TunnelSAFE
        • TunnelSAFE Gantry Design Refuge Chamber
        • TunnelSAFE Rail Design Refuge Chamber
        • TunnelSAFE MSV Design Refuge Chamber
        • TunnelSAFE Standard Design Refuge Chamber
        • TunnelSAFE Narrow Design Refuge Chamber
        • TunnelSAFE Slim Line Refuge Chamber
      • CoalSAFE
        • CoalSAFE International High Seam Refuge Chamber
        • CoalSAFE MSHA High Seam Refuge Chamber
        • CoalSAFE MSHA Mid Seam Refuge Chamber
        • CoalSAFE MSHA Low Seam Refuge Chamber
        • CoalSAFE Change-Over Station
      • StormSAFE
        • StormSAFE Cyclone Shelter
        • StormSAFE Lightning Shelter
      • Biora
        • Biora Plant Growth Chambers
        • Biora Research Grade Chambers
        • Biora Reach-In Chambers
        • Biora Stand Alone Scrubber
        • Biora Spectrometer
      • Utility
        • Climate Control Shelter
        • RocROOM (Remote Operating Control Room) for Underground Mining
        • MediSAFE First Aid Station
      • Training Chambers
        • Standard Design Training Chamber – Series IV
        • Compact Design Training Chamber – ELVP
        • Standard Design Training Chamber – Series III
      • Options & Upgrades
        • GuardIAN Remote Monitoring & Diagnostics System
        • Satellite UPS System
        • Aura-FX Digital Gas Monitoring
        • Compressed Air Management System (CAMS)
        • Pressure Systems for Refuge Chambers
        • Airlocks and Vestibules
        • Blast Upgrades
        • Refuge Chamber Transportation Upgrades
    • New Technologies
    • Hygiene
      • EnviroLAV Toilets
      • Coal Spec EnviroLAV Toilets
      • EnviroLAV Toilet Consumables
    • Wearable Technology
      • LED Cap Lamp Solutions
        • SiriUS Cap Lamps
        • HyperION Cap Lamps
        • HeliOS LED Cap Lamps
      • Cooling Vest
    • Air Quality Management
      • Aura-FX Gas Monitoring Systems
      • AirGEN Scrubbing System
      • AirMAX Life Support System
      • AirBANK Pressure System
    • Monitoring & Alert Systems
      • GuardIAN Remote Monitoring & Diagnostics System
      • Stench Gas Emergency Alert System
    • Mining Equipment
  • Industries
    • Hard Rock Mining
    • Coal Mining
    • Petrochemical
    • Tunnelling
    • Disaster Relief
    • Biotechnology
  • Client Support
    • Training Centre
    • Chamber Maintenance
    • After Sales Support
    • Engineering Resources
  • Blog
  • Contact
  • enEnglish (English)
    • esEspañol (Spanish)
MineARC Systems

Tag: tunnel emergency shelter

case-study-tunnelsafe-refuge-chamber-doha-project-feature

Tunnelling Safety Initiatives: ITA Awarded Products

Posted November 7, 2018February 11, 2019 AshleePosted in Tunnelling

Safety is paramount in any tunnelling project. Trusted tunnelling safety initiatives safeguard against accidents and emergencies.

india-cbip-tunnelling-workshop

India’s CBIP Tunnelling Workshop: The Growth of Risk Management

Posted September 5, 2018September 5, 2018 AshleePosted in Tunnelling

India recently held a workshop on New Austrian Tunnelling Method (NATM) and Tunnel Boring Machine (TBM) Tunnelling.

multi-service-vehicle-refuge-chamber-ita-feature

Multi Service Vehicle Refuge Chamber ITA Design Finalist

Posted September 3, 2018September 17, 2018 AshleePosted in Tunnelling

Recognised for the innovative design of the TunnelSAFE Multi Service Vehicle Refuge Chamber, the first of its kind in the world…

minearc-tunnelling-refuge-chamber-feature 4x5

Designing a Refuge Chamber for a Tunnelling Emergency

Posted September 2, 2018December 14, 2018 AshleePosted in Tunnelling

Developing a refuge chamber to meet the specific needs of the tunnelling industry…

case-study-undersea-tunnel-construction

Safety Critical for Underwater Tunnel Construction

Posted September 26, 2017January 31, 2019 AshleePosted in Tunnelling

The 30-person TunnelSAFE Gantry Design (GD) Refuge Chamber is situated on a 7.76m diameter Herrenknecht mixed shield TBM…

case-study-japanese-water-treatment-project

Compact TunnelSAFE Refuge Chamber for Water Treatment Project

Posted July 4, 2017September 13, 2018 AshleePosted in Tunnelling

The unique chambers will fit on to a Komatsu Tunnel Boring Machine (TBM) for a 2700mm diameter sewerage tunnel, approximately 50 kilometres long. The tunnel is being built between Hiroshima and Kure in Southern Honshu, Japan.

case-study-tunnel-refuge-chamber-misting

Refuge Chamber Solutions for Tunnelling Projects Across Europe

Posted July 13, 2016November 21, 2018 AshleePosted in Tunnelling

MineARC Refuge Chambers are in high demand at the Brenner Base Tunnel (BBT), with a fourth TunnelSAFE chamber due to be commissioned.

case-study-multiservice-vehicle-chamber-austria

Multi-Service Vehicle Chamber Designed for Tunnelling ERP

Posted June 7, 2016November 21, 2018 AshleePosted in Tunnelling

Multi-Service Vehicle Chamber for tunnelling is designed to be fitted with the client’s own remote control system, allowing the vehicle to be operated from within the refuge chamber.

case-study-tunnel-refuge-chamber-crescent-chilean-power

Hydro Power Project Utilise TunnelSAFE Refuge Chamber

Posted April 7, 2016November 21, 2018 AshleePosted in Tunnelling

The hydro-electric project, located high in the Chilean Andes south of Chile’s capital Santiago, aims to provide an annual total production of 2,320GWh once completed.

case-study-tunnel-rail-refuge-chamber-porr

Rail Design Refuge Chambers for Koralm Project

Posted October 21, 2015November 22, 2018 AshleePosted in Tunnelling

Rail Design chambers were built specifically for TBM contractor PORR AG to use throughout the KAT3 phase of the Koralm Tunnel Project.

Posts navigation

1 2 Next

newsletter subscribe

MineARC Newsletter Subscribe
Sign up for more information about MineARC.

Sign Up
  • Linkedin
  • Twitter
  • Instagram
  • Facebook
  • Youtube

CONTACT US

+61 (8) 9333 4966

HEAD OFFICE

274 Welshpool Road, Perth, Australia 6106
+61 (8) 9333 4966
Proudly powered by WordPress | Theme: Sydney by aThemes.
;